Preliminary & Conceptual Estimating Services in Florida

Reliable early-stage budgets before construction documents are finished. ROM, feasibility and design-stage estimates for developers, owners, architects and lenders, built from sketches, programs and schematic drawings and adjusted for Florida market conditions.

  • ROM & feasibility
  • Schematic & DD budgets
  • UniFormat systems
  • AACE Class 5–3
  • Lender-ready

Quick Answer

What Is a Preliminary or Conceptual Construction Estimate?

A preliminary (conceptual) construction estimate predicts a project’s cost early in design, when only a program, massing study or schematic drawings exist. Instead of measuring every item, the estimator uses parametric data, such as cost per square foot, per unit or per building system, together with key quantities and comparable projects.

Conceptual estimates help owners decide whether a project is feasible. They set a realistic target budget and help secure financing before the owner spends heavily on full design. Under AACE International guidance they are typically Class 5, 4 or 3 estimates.

Design stageProgram, concept, schematic design (SD) and design development (DD)
Estimate classesAACE Class 5 (screening), Class 4 (feasibility), Class 3 (budget authorization)
OrganizationUniFormat building systems (substructure, shell, interiors, services, sitework)
UsesFeasibility studies, pro formas, land acquisition, loan applications, design-to-budget
ClientsDevelopers, owners, architects, lenders, public agencies
TurnaroundOften 24–48 hours for ROM estimates

Make Confident Decisions Before You Spend on Full Design

The most important cost decisions happen early. Site selection, building size, structural system and finish level decide most of a project’s final cost, often before anyone has drawn a detailed plan. A well-built conceptual estimate lets you test options and catch budget problems while they are still cheap to fix.

Our preliminary estimates combine Florida-specific cost data, historical projects and system-level quantities taken from whatever documents exist. We organize the budget by UniFormat building system, which makes it easy to compare alternatives: CMU vs. tilt-wall, TPO vs. metal roofing, or surface parking vs. a structured garage.

Every conceptual estimate clearly states its AACE class, what it is based on, and the design and estimating contingencies we recommend. As the design develops, we update the budget at each milestone and reconcile it with the previous version, so owners always know why the number moved.

When drawings are complete, we convert the budget into a detailed construction cost estimate and, if needed, apply value engineering to bring the project back to budget before bidding.

What's Included

What's Included in Our Preliminary estimating Services

Everything an owner or lender needs to make an early go/no-go decision.

Program-Based Budget

Costs built from gross area, unit counts, parking, amenities and building type.

UniFormat System Breakdown

Substructure, shell, interiors, services, equipment and sitework costs by system.

Site Development Costs

Grading, fill, utilities, stormwater, paving and off-site improvements.

Florida Code Allowances

Wind, flood, impact-glazing and HVHZ requirements that affect early budgets.

Soft Cost Allowances

Design fees, permits, impact fees, testing, insurance and financing assumptions.

Contingency & Escalation

Design and construction contingency plus escalation to the expected construction start.

Cost Benchmarks

Cost per square foot, per unit and per key, compared with similar Florida projects.

Option Comparisons

Side-by-side pricing of alternative sizes, systems or phasing plans.

Basis of Estimate

Written assumptions, exclusions and estimate class for lender or board review.

Early-Stage Estimates

Preliminary Estimates We Prepare

Every scope is measured and priced the way Florida crews build it.

Rough Order of Magnitude (ROM)

Quick screening budgets for land deals and early decisions.

Feasibility Estimates

Budgets that feed pro formas and investment decisions.

Schematic Design Estimates

System-level budgets from SD drawings.

Design Development Estimates

More detailed budgets as systems and finishes are selected.

Construction Cost Estimating Services →

Lender Budget Reviews

Independent budgets supporting construction loans.

Design-to-Budget Support

Milestone updates that keep design aligned with budget.

Value Engineering & Cost Consulting Services →

Multifamily Pro Forma Budgets

Per-unit and per-square-foot budgets for residential developments.

Multifamily & Mixed-Use Estimating →

Public Project Budgets

Early estimates for municipal and capital improvement planning.

Government & Municipal Estimating →

Get Your Preliminary estimating Quote Today

Upload your plans and bid date. You’ll get a flat-fee quote and delivery date, usually within a few business hours.

Florida Expertise

Florida Factors That Change Preliminary estimating Costs

Florida’s codes, climate and market conditions add costs that generic national estimating data routinely misses.

HVHZ & Wind Design

Miami-Dade and Broward fall under the Florida Building Code’s High-Velocity Hurricane Zone, with tested, NOA-approved products and stricter attachment. Wind design statewide drives connectors, sheathing and roofing costs.

Impact-Rated Openings

Wind-borne debris regions require impact windows and doors or approved shutters, often a major envelope cost. See door & window estimating.

Flood Zones & Elevation

FEMA flood zones change foundation design: elevated slabs, stem walls, flood vents and breakaway walls are measured, not treated as allowances.

Groundwater & Soils

High water tables, muck removal, fill import and dewatering are priced from the geotechnical report. See sitework estimating.

Condo Safety Laws

Milestone inspections and SIRS requirements drive concrete restoration and waterproofing budgets. See renovation estimating.

Storm-Season Pricing

Demand surge after hurricanes and June–November weather risk are reflected in escalation and contingency. See storm reconstruction estimating.

How It Works

How Our Preliminary estimating Process Works

1

Send Plans & Scope

Upload drawings, specs, addenda and your bid date through our contact page.

2

Free Quote

We confirm scope, flat fee and delivery date, usually the same business day.

3

Takeoff & Pricing

Our estimators measure every quantity digitally and price it for your Florida county.

4

QA Review & Delivery

A senior estimator reviews everything. You receive Excel, PDF and marked-up plans, plus bid-day support.

What You Receive

  • Editable Excel workbook organized by CSI division
  • Summary PDF with totals and unit costs
  • Color-coded marked-up drawings for every quantity
  • Material, labor and equipment breakdown on each line
  • Written assumptions, inclusions and exclusions
  • Revisions for addenda and design changes

Who We Work With

How Much Do Preliminary estimating Services Cost?

We charge a flat fee per project, quoted free after we review your plans. The fee depends on project size, number of trades or systems, drawing complexity, required level of detail and your deadline. ROM estimates are the most affordable; design-development budgets require more detail.

There are no subscriptions or hidden charges, and you approve the price before we start. Most projects are delivered in 24 to 72 hours. Request your free quote.

Related Services

Related Construction Estimating Services

Construction Cost Estimating Services

Complete, bid-ready estimates priced by CSI division.

Value Engineering & Cost Consulting Services

Priced alternatives that cut cost without cutting performance.

Construction Takeoff Services

Digital quantity and material takeoffs from your plans.

Commercial Estimating Services

Offices, retail, restaurants, hotels and tenant improvements.

Residential Estimating Services

Custom homes, spec homes, additions and remodels.

Industrial Estimating Services

Warehouses, plants, cold storage and logistics facilities.

Bid Preparation & Bid Leveling Services

Bid packages, scope sheets and subcontractor bid leveling.

Change Order Estimating Services

Documented pricing for changes during construction.

Service Areas

Preliminary estimating Services Across Florida

We provide preliminary estimating for projects in every Florida county, priced for local labor, supplier, permitting and wind/flood conditions. View all service areas.

Bid More Projects Without Hiring an Estimator

Flat-fee preliminary estimating delivered to your bid date. Send your plans for a free quote.

Our Location

Visit or Contact Our Miami Estimating Office

Florida Construction Estimating Services

Our Miami estimating office serves contractors, developers and property owners in every Florida county, with remote delivery for projects nationwide.

Get a Free QuoteGet Directions

FAQs

Preliminary estimating: Frequently Asked Questions

How accurate is a conceptual estimate?
Accuracy depends on design maturity. AACE Class 5 estimates typically range from about -20% to -50% low and +30% to +100% high, while Class 3 estimates narrow to roughly -10% to -20% and +10% to +30%. We state the class and recommended contingency on every estimate.
What do you need to prepare a preliminary estimate?
A site location, building type and size, and any program, sketches, massing or schematic drawings you have. The more information we receive, the tighter the estimate.
Can a conceptual estimate be used for a loan?
Yes. Lenders often accept conceptual or budget estimates for early financing, especially when the basis of estimate and contingencies are clearly documented.
What is the difference between a ROM and a budget estimate?
A ROM is a quick screening number, usually from square-foot data. A budget estimate is built from schematic or DD drawings with system-level quantities and is more reliable.
Do you update estimates as the design progresses?
Yes. We update the budget at each design milestone and reconcile changes so you can see exactly what moved the number.
Can you compare different building options?
Yes. We price alternative sizes, structural systems, finishes and phasing plans side by side. See Value Engineering & Cost Consulting Services.
How fast can you deliver?
Most projects are delivered in 24 to 72 hours. Larger or multi-trade projects are scheduled to meet your bid date.
Is my project information kept confidential?
Yes. Drawings, pricing and bid results are used only for your estimate and never shared. We will sign an NDA on request.

Ready to Bid With Confidence?

Send your plans today for a free, no-obligation quote on your construction estimate or takeoff, usually within a few business hours.

Florida Construction Estimating Services
3339 Virginia St Apt 305, Miami, FL 33133
+1 (816) 683-1595  |  ask@floridaconstructionestimatingservices.com

Scroll to Top